Petrobras approved a US$122 billion strategic plan for the 2027‑2031 period, aiming to raise daily production to 3.2 million barrels and expand sustainable investments.
The Board of Directors of Petrobras formalized the approval of its new Business Plan for the 2027‑2031 cycle. The state‑owned company projects total investments of US$122 billion to expand its operations and accelerate the consolidation of new markets.
Of the total amount approved by the board, US$113 billion correspond to projects already in the implementation phase, while US$9 billion will be earmarked for projects currently under technical review. The estimate is that commercial production will reach 3.2 million barrels of oil equivalent per day (boed) starting in 2028.
The corporate strategy remains focused on growing high‑margin fossil fuel production, while allocating significant portions of the budget to decarbonization, biofuels, and renewable energy initiatives.
Focus on the Pre‑Salt and Extraction Expansion
The Exploration and Production (E&P) sector will receive the largest share of resources, totaling US$83 billion in confirmed projects and US$3 billion in initiatives under study. This allocation represents more than 70% of all capital planned for the five‑year period.
Most of these direct investments, about 60%, will target pre‑salt fields, while 23% will be applied to post‑salt and 12% to strictly exploratory activities. The remainder will cover onshore operations, international assets, and decarbonization technologies.
State‑owned company president Magda Chambriard emphasized the pursuit of profitability and budget control when commenting on the allocation of resources:
blockquote>
“This is a plan built with ambition and will be executed responsibly. That means capital discipline and rigor in every decision. We will invest in projects that maintain a positive return even in the most challenging scenarios, all underpinned by solid approval governance.”
To sustain this production level, nine new production systems are slated to enter operation by 2031, along with roughly 50 complementary projects. The Campos and Santos basins will receive US$ 14 billion in interventions to optimize mature reservoirs and drill about 100 additional wells.
Additionally, reserve replacement will receive US$ 10 billion for drilling 50 exploratory wells in strategic regions such as the Equatorial Margin and the southern and southeastern coastlines of the country. The average production cost is projected at US$ 31 per barrel of oil equivalent.
Refining and Logistics Modernization
The Refining, Transport, and Marketing division (RTC), which also includes the petrochemical and fertilizer segments, will have US$ 24 billion in resources. The primary focus is on increasing operational efficiency of existing plants, without building new refinery complexes.
The total oil processing capacity will rise from the current 1.813 million barrels per day to 2.173 million barrels per day by 2031. This expansion of 360 thousand barrels per day will focus on boosting production of light, high‑value-added derivatives, with a highlight on S‑10 diesel.
Key refining projects include the implementation of Train 2 at the Abreu e Lima Refinery (RNEST) and structural expansions at the Boaventura Complex, both slated to enter commercial operation in 2029.
In logistics and commercial areas, US$ 7 billion is planned for building 21 coastal vessels and expanding pipeline networks, such as the New Claros Pipeline. In the agricultural inputs sector, the completion of the Nitrogen Fertilizer Unit III (UFN‑III) is highlighted, scheduled for 2029.
Low‑Carbon and Sustainability Bets
Initiatives aimed at energy transition and decarbonization will receive a total investment of US$ 13.5 billion over the five‑year plan. The amount covers operational investments in low‑carbon technologies, industrial emission mitigation, and research and development (R&D) projects.
Within the Low‑Carbon Gas and Energy segment, US$ 4 billion will be directly invested in solar, wind, biogas, ethanol, and storage projects. One milestone will be the sustainable aviation fuel (SAF) and renewable diesel operation at the Presidente Bernardes Refinery (RPBC), slated for 2030.
The oil company reiterated its ambition to achieve operational emission neutrality by 2050. Interim targets call for up to a 20% reduction in absolute greenhouse‑gas emissions by 2035 compared to 2015 levels.
Cash Flow and Dividend Distribution
The financial viability of the strategic plan rests on a robust operating cash‑flow (FCO) outlook, projected between US$ 230 billion and US$ 250 billion over the period. The gross debt target sets a ceiling of US$ 75 billion, with a downward trajectory toward US$ 65 billion.
Based on this expected financial performance, Petrobras plans to distribute between US$ 55 billion and US$ 60 billion in ordinary dividends to its shareholders from 2027 to 2031. The amount represents a significant increase of US$ 10 billion over the projections in the previous business plan.
The new five‑year plan signals Petrobras’s consolidation as an energy giant focused on maximizing the profitability of its pre‑salt reserves, while paving the way for its adaptation to global decarbonization demands.
The execution of projects will depend on strict adherence to economic viability metrics and environmental approvals. Progress in these areas will set the pace of the company’s transition in the coming years and its role in national energy supply.
